COMPLETED PROJECTS

1

AFF Project Taif, Sub-contractor of Hanil Dev. Co.
Contract period begin 1st Oct. 1996.

2

ABF Project Tabuk, Sub-contractor of Hanil Dev. Co. Under Ballast Nedam Group NV.
Contract period 8th Feb. 1996 to 1997.

3

ABF Project Al-Jouf, Sub-contractor of Ballast Nedam Group NV.
Contract period 15th Sept. 1996 to 1998.

4

ABF Project Al-Jouf, Sub-contractor of  Al SAIF Engineering & Contracting Est.
Contract begin 13th Feb. 1998.

5

Building in many areas of S.K.D.
Concrete works for bridges of highways, Jeddah – Madina.

6

Shopping Center Building Extension Project in Jeddah as Contractor.

7

Private Villa’s turnkey Project in Jeddah as contractor.

8

Yanpet Expansion Project Yanbu
subcontractor of Saudi Bin Ladin Group. (under Royal Commission)
Contract period 29th Sept. 1997 to Feb. 1999.

9

Feedstock & Product Pipeline Yanbu
subcontractor of Dywidag Saudi Arabia Co. Ltd. (under Royal Commission)
Contract period 10th Nov. 1998 to 10 Oct. 1999.

10

Yanbu Cement Company’s Expansion Project at Yanbu.
Subcontractor to KHD Humboldt Wedag A.G. for Opening up of Limestone Quarry by excavating a volume 425,000 m3 and ancillary works including forming safety barrier around the pit
rim, test boreholes, Rock overhang and prepare for the Tank farm and other related works.

11

Al-Dawadmi Airport Project, subcontractor of Saudi Bin-Ladin Group.
Contract begin 13th Nov. 2000.

12

Shoaiba - Jeddah Mass Project, Road works and Earthworks
subcontractor of ASAS Construction Co., Ltd.
Contract period 4th Dec. 1999 to 17-9-2000.

13

S.P.P. Project, Shoaiba, Construction of Roads, Back filling, Subkha excavation and earthworks etc.
subcontractor of Saudi Archirodon Ltd. under ABB Company.
Contract period 6th Nov. 2000 to 24th Nov. 2001.

14

S.P.P. Project, Shoaiba, Construction of Access Roads with Saudi Condreco Ltd.
Contract period begin April 2001.

15

S.P.P. Project, Shoaiba, Construction of Road to National Guard
compound with Saudi Archirodon Ltd.

Contract period begin June 2001.

16

Sukhayabarat to Bulghah Access Road construction works with A.R. Namlah Corp.
Contract period begin 3rd Dec. 2001.

17

Amir Sattam Real Estate Project, Jeddah, Construction of Roads, with GAC. Jeddah
Contract period begin 3rd Jan 2002.

18

Supermarket Watani Project - Makkah, Construction of Roads and Earthworks with GAC. Jeddah.
Contract period begin 13th Feb 2002.

19

Jamoom Municipal Road Project, Construction and Earthworks, sub-contractor to General Agencies & Contracting.
Scope of work: Construction of Road includes Cutting of existing Asphalt, Supply of material, Placing and Grading, Compaction, Preparation of road embankment, supervision, survey and layout.
Contract period begins 18th March 2002.

20

PIC L-1871 Coastal Road Project Linking MYAS with Yanbu Al-Bahr (Phase-1) under Royal Commission.
Subcontractor to General Agencies & Contracting.
Scope of work: Construction for 8.38 km length of Roads include supply of granular base course material, preparation of road embankment, placing of material, grading, compaction, survey and supervision.
Contract period begins 20th August 2002.

21

Jeddah Al Jawad Entrance Road.
Sub-contractor to Abbar & Zainy Contracting.
Scope of work: Su-base works for preparation of road embankment, excavation, backfilling, placing of material, grading, compaction, survey and supervision.
Contract period begins 7th July 2003.

22

Jeddah Al Jawad Entrance Road. Sub-contractor to Al Safa Contracting Co. – Jeddah Municipality
Scope of work: Su-base works for preparation of road embankment, excavation, backfilling, placing of material, grading, compaction, survey and supervision.
Contract period begins 8th September 2004.

23

Umm Al-Qura University Project Makkah-construction of service road, Sub-contractor to Rabya Construction.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins 1st August 2002.

24

Wadi Noman Project Makkah – Storm Flood Water Access Part 1;
Construction of service road, Subcontractor to Rabya Construction.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins 1st October 2003.

25

Shoaiba Power Plant Stage-2, Phase-I & II
Earthworks subcontract with Saudi Archirodon Ltd.
Scope of work: General Filling. Excavation and Back-filling, Backfilling with imported materials, transportation of Spill and spoil of Sabkha materials, Preparation of Road Base and Sub-base, Bedding for Pipes, Trenching, etc.
Contract period begins 10th February 2004

26

Umm Al-Qura University Project Makkah – Roads & Subbase works, Sub-contractor to Rabya Construction.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins 12th December 2004.

27

Umm Al-Qura University Project Makkah
Construction of service road, Sub-contractor to Rabya Construction.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins 19th February 2006.

28

Umm Al-Qura University Project Makkah
Construction of Flood Water Access Part 2, Sub-contractor to Rabya Construction.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works including supervision, survey and layout.

29

Hail – Al Jouf Road Project,
Sub-contractor to ALHARBI TRADING & CONTRACTING.

Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins 1st February 2007.

30

Saline Water Conversion Corporation
Water Transmission Line System for New Satellite Project in Rabigh City - Pipe Laying & fixing works - Sub-contractor with Al Harbi Trading & Contracting Co. Ltd.
Scope of work: Trench Excavation, Pipe Laying, Fixing, Manhole, Water Testing, Backfilling and Asphalt works.
Contract period begins 1ST March 2007.

31

Bay La Sun Infrastructure Project 2
Sub-contractor to ALHARBI TRADING & CONTRACTING.
Scope of work: Cutting and Filling, Grading, Compaction, and Sub-base works for the road including supervision, survey and layout.
Contract period begins: 13th August 2008.

32

King Abdullah Economic City Overall
Infrastructure P-1 Z Road Project, Construction of Road - Precast Factory in Rabigh, Earthworks - Sub-contractor with SAUDI BIN LADEN GROUP - PBA.
Scope of work: Whole Earthworks for Road construction and sub-base works.
Contract period begins 6th October 2007.

33

King Abdullah Economic City - Bay La Sun Infrastructure
Contract 1- Beach Access Road South, Peninsula Drive and Beach Corniche Road - Sub-contractor with AL MADODI COMPANY.
Scope of work: Site construction for Road works include water supply, valves and accessories fitting, connection to pipe network, Civil works include trench excavation, pipe bedding, sanitary sewage and its pipe line works, manhole works, irrigation and firefighting system, storm drainage works, etc.
Contract period begins 20th May 2008.

34

Saber Interchange - Sub-contractor with AL HARBI TRADING CO.
Scope of work: Site construction for Road works, Civil works include trench excavation. etc.
Contract period begins 18th March 2009.

35

Jetty, intake lagoon, discharge works, civil and Building works (packeges1, 3, 7) for Shoiba ll ccpp Project- Subcontractor with Saudi Archirodon Limited.
Scope of work: The supply of Quarry Run materials.
Contract Period begins 27th August 2012

BUILDINGS

1

Tatawer VILLAS PROJECT
Subcontractor With TATAWER REAL ESTATE INVESTMENTS CO.
SCOPE OF WORK: BUILDING RESIDENTIAL VILLAS
Contract period begin; November 2011 (6 villas)

2

EMAAR VILLAS Project with Emaar Integrated Construction Co. Ltd
SCOPE OF WORK: BUILDING RESIDENTIAL VILLAS
1 Contract Period begin; May 2010 (6 villas)
2 Contract Period begin; July 2011 (12 villas)